- Instructor: admin
- Lectures: 1
- Students: 122
- Duration: 8 weeks
Categories: Program Based Budgeting
Plan the Unit’s Annual Work Plan. Collate MDA’s AWP and budget. Apply the terms contained in the budget cycle. Use the CoA and Oracle Hyperion to prepare an annual program based budget. Generate reports from the Oracle Hyperion Monitor and control program based budget for the MDAs/MMDAs within the budget cycle